| dc.contributor.advisor | Buitrago Méndez, Diego Fernando / Asesor | |
| dc.contributor.author | Ramírez Mosquera, Karen Daniela | |
| dc.contributor.author | Cuadros Jiménez, Oscar Javier | |
| dc.contributor.author | Duarte Gallo, Jaison Alfredo | |
| dc.date.accessioned | 2024-06-22T00:19:26Z | |
| dc.date.available | 2024-06-22T00:19:26Z | |
| dc.date.issued | 2024-05 | |
| dc.identifier.uri | http://repository.unipiloto.edu.co/handle/20.500.12277/13738 | |
| dc.description.abstract | Para los proyectos de construcción en general es importante tener en cuenta el principio de
planeación, siendo esta una etapa en la cual se pueden identificar las variables que impacten
positiva o negativamente la ejecución y desde este momento poder resolver o reducir el
impacto negativo de las mismas y aprovechar las oportunidades de los impactos positivos en la
etapa de ejecución, es por esto que se debe esclarecer y tratar de identificar la totalidad de
variables que generan impacto para la elaboración de una prefactibilidad óptima en un
proyecto.
De acuerdo con lo anterior descrito, el plan se basará en realizar un estudio de las variables
que puedan impactar en la ejecución de un proyecto, en este caso se toma como modelo la
prefactibilidad de la Subestación de Policía en el Municipio de Rondón Boyacá, con el fin de
identificar las variables y reducir el impacto negativo que estas generan para de esta manera
establecer estrategias que permitan reducir los impactos en la etapa de ejecución e impliquen
realizar actuaciones de tipo contractual (alcance, tiempo, costo).
Por otra parte, se determina el costo, cronograma y personal necesario para elaborar la
prefactibilidad del proyecto e identificar y plantear estrategias que permitan reducir los posibles
riesgos que se presentan en la etapa de ejecución. | es |
| dc.description.abstract | For construction projects in general, it is important to consider the principle of planning.
This stage allows for the identification of variables that may positively or negatively
impact execution. At this point, negative impacts can be resolved or minimized, and
opportunities from positive impacts can be seized during the execution phase.
Therefore, it is crucial to clarify and attempt to identify all variables that may impact the
optimal pre-feasibility of a project.
In accordance with the aforementioned, the plan will focus on conducting a study of
variables that could affect project execution. In this case, the pre-feasibility of the Police
Substation in the Municipality of Rondón Boyacá serves as a model. The goal is to
identify these variables and mitigate their negative impacts, thereby establishing
strategies to reduce impacts during execution, which may involve contractual actions
(scope, time, cost).
Furthermore, the cost, schedule, and personnel required to develop the project's prefeasibility will be determined. Additionally, strategies will be proposed to reduce
potential risks during the execution phase. | en |
| dc.publisher | Universidad Piloto de Colombia | spa |
| dc.source | instname:Universidad Piloto de Colombia | spa |
| dc.source | reponame:Repositorio Institucional RE-pilo | spa |
| dc.subject | Proyectos de construcción | es |
| dc.subject | Gerencia de proyectos | es |
| dc.subject | Formulación de proyectos de infraestructura | es |
| dc.subject | Viabilidad de proyecto | es |
| dc.subject | Construction projects | en |
| dc.subject | Proyect Management | en |
| dc.subject | Formulation of infrastructure projects | en |
| dc.subject | Feasibility of a project | en |
| dc.title | Estrategias de Mejora del Proceso de Formulación de Proyectos de Infraestructura de Seguridad del Ministerio del Interior, Plan Piloto: Subestación de Policía en el Municipio de Rondón Departamento de Boyacá | es |
| dc.type | Trabajo de Grado | es |
| dc.publisher.program | Especialización en Gerencia de Proyectos | spa |
| dc.publisher.department | Facultad Ciencias Sociales y Empresariales. | spa |
| dc.creator.modality | Presencial | es |