Show simple item record

dc.contributor.advisorBuitrago Méndez, Diego Fernando / Asesor
dc.contributor.authorRamírez Mosquera, Karen Daniela
dc.contributor.authorCuadros Jiménez, Oscar Javier
dc.contributor.authorDuarte Gallo, Jaison Alfredo
dc.date.accessioned2024-06-22T00:19:26Z
dc.date.available2024-06-22T00:19:26Z
dc.date.issued2024-05
dc.identifier.urihttp://repository.unipiloto.edu.co/handle/20.500.12277/13738
dc.description.abstractPara los proyectos de construcción en general es importante tener en cuenta el principio de planeación, siendo esta una etapa en la cual se pueden identificar las variables que impacten positiva o negativamente la ejecución y desde este momento poder resolver o reducir el impacto negativo de las mismas y aprovechar las oportunidades de los impactos positivos en la etapa de ejecución, es por esto que se debe esclarecer y tratar de identificar la totalidad de variables que generan impacto para la elaboración de una prefactibilidad óptima en un proyecto. De acuerdo con lo anterior descrito, el plan se basará en realizar un estudio de las variables que puedan impactar en la ejecución de un proyecto, en este caso se toma como modelo la prefactibilidad de la Subestación de Policía en el Municipio de Rondón Boyacá, con el fin de identificar las variables y reducir el impacto negativo que estas generan para de esta manera establecer estrategias que permitan reducir los impactos en la etapa de ejecución e impliquen realizar actuaciones de tipo contractual (alcance, tiempo, costo). Por otra parte, se determina el costo, cronograma y personal necesario para elaborar la prefactibilidad del proyecto e identificar y plantear estrategias que permitan reducir los posibles riesgos que se presentan en la etapa de ejecución.es
dc.description.abstractFor construction projects in general, it is important to consider the principle of planning. This stage allows for the identification of variables that may positively or negatively impact execution. At this point, negative impacts can be resolved or minimized, and opportunities from positive impacts can be seized during the execution phase. Therefore, it is crucial to clarify and attempt to identify all variables that may impact the optimal pre-feasibility of a project. In accordance with the aforementioned, the plan will focus on conducting a study of variables that could affect project execution. In this case, the pre-feasibility of the Police Substation in the Municipality of Rondón Boyacá serves as a model. The goal is to identify these variables and mitigate their negative impacts, thereby establishing strategies to reduce impacts during execution, which may involve contractual actions (scope, time, cost). Furthermore, the cost, schedule, and personnel required to develop the project's prefeasibility will be determined. Additionally, strategies will be proposed to reduce potential risks during the execution phase.en
dc.publisherUniversidad Piloto de Colombiaspa
dc.sourceinstname:Universidad Piloto de Colombiaspa
dc.sourcereponame:Repositorio Institucional RE-pilospa
dc.subjectProyectos de construcciónes
dc.subjectGerencia de proyectoses
dc.subjectFormulación de proyectos de infraestructuraes
dc.subjectViabilidad de proyectoes
dc.subjectConstruction projectsen
dc.subjectProyect Managementen
dc.subjectFormulation of infrastructure projectsen
dc.subjectFeasibility of a projecten
dc.titleEstrategias de Mejora del Proceso de Formulación de Proyectos de Infraestructura de Seguridad del Ministerio del Interior, Plan Piloto: Subestación de Policía en el Municipio de Rondón Departamento de Boyacáes
dc.typeTrabajo de Gradoes
dc.publisher.programEspecialización en Gerencia de Proyectosspa
dc.publisher.departmentFacultad Ciencias Sociales y Empresariales.spa
dc.creator.modalityPresenciales