dc.description.abstractEl presente trabajo surge de la necesidad de EMGESA S.A E.S.P. de realizar mejoras en la central hidroeléctrica del Guavio, mediante obras de reforzamiento estructural y adecuación de la fachada para mitigar la vulnerabilidad sísmica el cual garantizará un mejor funcionamiento en la prestación del servicio. La finalidad del proyecto es asegurar el cumplimiento de la Norma Sismo Resistente vigente NSR-10 y la minimización de la vulnerabilidad sísmica del edificio de control, los pozos A y B y la fachada del edificio administrativo de la central hidroeléctrica del Guavio, ejecutando las obras requeridas para dar cumplimiento a la NSR-10. Las edificaciones incluidas en este proyecto se clasifican como indispensables porque deben funcionar durante y después de un sismo, por ser centrales de operación y control de servicios vitales. Es prioridad realizar trabajos que estén enmarcados en procesos de seguridad e integridad de las líneas vitales e instalaciones críticas, es fundamental la minimización de la vulnerabilidad ante la amenaza sísmica y aplicar las medidas de mitigación. El trabajo se realiza de acuerdo a las buenas prácticas en el tema de Gerencia de Proyectos aplicando todos los conceptos, que permiten obtener el mejor resultado en el desarrollo del proyecto.es
dc.description.abstractThe present work arises from the need of EMGESA S.A. E.S.P. to make improvements in the hydroelectric power station of Guavio, by means of structural reinforcement works and adequacy of the façade to mitigate the seismic vulnerability which will guarantee a better functioning in the provision of the service. The purpose of the project is to ensure compliance with the existing earthquake resistant norm NSR-10 and the minimization of the seismic vulnerability of the control building, the a and b wells and the façade of the administrative building of the Guavio hydroelectric power plant, executing the works required to provide compliance with the NSR-10. The buildings included in this project are classified as indispensable because they must operate during and after an earthquake, as they are central to the operation and control of vital services. It is a priority to carry out works that are framed in processes of security and integrity of vital lines and critical facilities, it is essential to minimize vulnerability to the seismic threat and apply mitigation measures. The work is carried out according to good practices in the topic of Project Management applying all the concepts, which allow obtaining the best result in the development of the project.en
dc.publisherUniversidad Piloto de Colombiaspa
dc.sourceinstname:Universidad Piloto de Colombiaspa
dc.sourcereponame:Repositorio Institucional RE-pilospa
dc.subjectCentral Hidroeléctrica El Guavioes
dc.subjectConstrucciones antisísmicas-normases
dc.subjectEl Guavio Hydroelectric Planten
dc.subjectAnti-seismic constructions-standardsen
dc.titleReforzamiento estructural para minimizar vulnerabilidad sísmica en edificios administrativos Central Hidroeléctrica del Guavioes
dc.typeTrabajo de Gradoes
dc.publisher.programEspecialización en Gerencia de Proyectosspa
dc.publisher.departmentFacultad Ciencias Sociales y Empresariales.spa


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record