| dc.contributor.advisor | Labrador Tovar, Magali Yadira / Asesora | |
| dc.contributor.author | Blanco Movilla, Drina Luz | |
| dc.contributor.author | Bernal Ruiz, Adriana Marcela | |
| dc.contributor.author | Palencia Galvis, Orlando | |
| dc.date.accessioned | 2019-03-28T19:52:22Z | |
| dc.date.available | 2019-03-28T19:52:22Z | |
| dc.date.issued | 2018-01-08 | |
| dc.identifier.uri | http://repository.unipiloto.edu.co/handle/20.500.12277/4942 | |
| dc.description.abstract | El puerto Fluvial “Victoria Regia” presta sus servicios al municipio de Leticia, departamento del Amazonas, donde llegan embarcaciones tanto nacionales como internaciones provenientes de Brasil y Perú, se encuentra localizado en Latitud (-4.2031) Longitud: (-63.935906), presenta unas dimensiones en el puente de acceso de 4.00 m por 500 m de largo, su plataforma está construida en concreto, y sus soportes son metálicos.
Teniendo en cuenta las condiciones actuales del puerto se ve la necesidad de extender la estructura principal del puerto en 30 m, conservando las mismas características del existente; posteriormente se realizar el traslado de la plataforma flotante existente a su nueva posición.
La finalidad de esta obra es llevar la plataforma de descargue hacia el canal de navegación del río Amazonas en épocas de verano y así poder garantizar en todos los meses del año el servicio de descargue del muelle. | es |
| dc.description.abstract | The river port "Victoria Regia" serves the municipality of Leticia, department of Amazonas, where both national and international vessels from Brazil and Peru arrive, it is located in Latitude (-4.2031) Longitude: (-63.935906), presents some dimensions in the access bridge of 4.00 m by 500 m long, its platform is built in concrete, and its supports are metallic. Taking into account the current conditions of the port, we see the need to extend the main structure of the port by 30 m, keeping the same characteristics of the existing one; Subsequently, the transfer of the existing floating platform to its new position will be carried out. The purpose of this work is to take the unloading platform to the navigation channel of the Amazon River in summer times and thus be able to guarantee in all months of the year the unloading service of the wharf. | eng |
| dc.publisher | Universidad Piloto de Colombia | spa |
| dc.source | instname:Universidad Piloto de Colombia | spa |
| dc.source | reponame:Repositorio Institucional RE-pilo | spa |
| dc.subject | Terminales [transporte] | es |
| dc.subject | Puertos [Colombia] | es |
| dc.subject | Terminals [transportation] | eng |
| dc.subject | Ports [Colombia] | eng |
| dc.title | Ampliación del Puerto Internacional de Leticia "Victoria Regia" | es |
| dc.type | Trabajo de Grado | es |
| dc.creator.degree | Especialista en Gerencia de Proyectos | spa |
| dc.publisher.program | Especialización en Gerencia de Proyectos | spa |
| dc.publisher.department | Facultad Ciencias Sociales y Empresariales. | spa |
| dc.creator.modality | Virtual | |