| dc.contributor.advisor | Galeano Avendaño, Joan David / Asesor | |
| dc.contributor.author | Patiño Morales, Hernán Dario | |
| dc.date.accessioned | 2026-01-19T21:24:24Z | |
| dc.date.available | 2026-01-19T21:24:24Z | |
| dc.date.issued | 2025-11 | |
| dc.identifier.uri | http://repository.unipiloto.edu.co/handle/20.500.12277/14516 | |
| dc.description.abstract | El presente trabajo de tesis tiene como objetivo implementar un programa de
mantenimiento preventivo en la gestión de maquinaria pesada de la empresa Maquinobras SAS
para reducir los riesgos operativos y los tiempos muertos no planificados. La investigación, de
enfoque mixto, combina métodos cualitativos y cuantitativos para diagnosticar la situación actual
de la flota de maquinaria. A través de encuestas y entrevistas al personal, se identificaron
prácticas inadecuadas de mantenimiento que afectan la productividad y aumentan los costos
operativos.
Se propone un programa maestro de mantenimiento preventivo que incluye la
planificación y programación de tareas para minimizar fallas, prolongar la vida útil de los
equipos y optimizar su rendimiento. El análisis de casos exitosos en otras empresas del sector
demuestra que esta estrategia no solo reduce costos de reparación, sino que también mejora la
satisfacción del cliente.
Los resultados del análisis financiero muestran un Valor Actual Neto (VAN) positivo y
una Tasa Interna de Retorno (TIR) atractiva, lo que respalda la viabilidad económica del
programa. En conclusión, una gestión adecuada de la maquinaria pesada y un enfoque proactivo
en el mantenimiento son fundamentales para el crecimiento sostenible de Maquinobras SAS en
el sector construcción. | es |
| dc.description.abstract | The purpose of this thesis is to implement a preventive maintenance program in the
management of heavy machinery at the company Maquinobras SAS to reduce operational risks
and unplanned downtime. The research, with a mixed approach, combines qualitative and
quantitative methods to diagnose the current situation of the machinery fleet. Through surveys
and interviews with staff, inadequate maintenance practices were identified that affect
productivity and increase operating costs.
A master preventive maintenance program is proposed that includes planning and
scheduling tasks to minimize failures, prolong the useful life of the equipment and optimize its
performance. The analysis of successful cases in other companies in the sector shows that this
strategy not only reduces repair costs, but also improves customer satisfaction.
The results of the financial analysis show a positive Net Present Value (NPV) and an
attractive Internal Rate of Return (IRR), which supports the economic viability of the program.
In conclusion, proper management of heavy machinery and a proactive approach to maintenance
are essential for the sustainable growth of Maquinobras SAS in the construction sector. | en |
| dc.subject | Gestión de maquinaria pesada | es |
| dc.subject | Mantenimiento preventivo | es |
| dc.subject | Gestión de proyectos | es |
| dc.subject | Heavy machinery management | en |
| dc.subject | Preventive maintenance | en |
| dc.subject | Project management | en |
| dc.title | Gestión de Maquinaria Pesada: Reducción de Riesgos Operativos y Tiempos Muertos no Planificados en Proyectos de Construcción | es |
| dc.type | Trabajo de Grado | es |
| dc.creator.modality | Presencial | es |