| dc.contributor.advisor | Labrador Tovar, Magali Yadira / Asesora | |
| dc.contributor.author | Moreno Ardila, Laura Angélica | |
| dc.contributor.author | Ortiz Rojas, Lina Maria | |
| dc.contributor.author | Useche Díaz, Nelson Fernando | |
| dc.date.accessioned | 2023-03-01T22:13:04Z | |
| dc.date.available | 2023-03-01T22:13:04Z | |
| dc.date.issued | 2022-11-16 | |
| dc.identifier.uri | http://repository.unipiloto.edu.co/handle/20.500.12277/12367 | |
| dc.description.abstract | El presente documento comprende la fase de prefactibilidad de estudio para la situación problema encontrada entre los municipios de Villeta y Útica a la altura del municipio de Quebradanegra, con respecto a la mala intercomunicación Vial ( Tránsito Vehicular ) para la comunidad en este sector. Con el fin de ejecutar una planeación para la solución del problema, se planteó un proyecto que este comprometido por los objetivos necesarios para el desarrollo de la solución, adicionalmente se describe la situación problema enfatizada en las necesidades existentes de la población y que dan pie al desarrollo dicho proyecto, Finalmente se consideró la necesidad o problema, y a partir de la propuesta se dieron alternativas de solución, se genero su respectiva evaluación y la respuesta de una descripción optima, Viable, Segura, Que se procede a implementar como proyecto. | es |
| dc.description.abstract | The present document includes the phase of prefactibility of study for the problem
situation found between the municipalities of Villeta and Utica at the height of the municipality
of Quebradanegra, with respect to poor road intercommunication (Vehicular traffic) for the
community in this sector. In order to implement a plan for the solution of the problem, a project
was proposed that is understood by the objectives necessary for the development of the solution,
additionally describes the problem situation emphasized in the existing needs of the population
and that give rise to the development of said project, Finally the need or problem was considered,
and from the proposal alternative solutions were given, their respective evaluation was generated
and the response gives an optimal, viable and safe description, which is implemented as a
project. | en |
| dc.publisher | Universidad Piloto de Colombia | spa |
| dc.rights | Reconocimiento-SinObraDerivada 2.5 Colombia | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nd/2.5/co/ | * |
| dc.source | instname:Universidad Piloto de Colombia | spa |
| dc.source | reponame:Repositorio Institucional RE-pilo | spa |
| dc.subject | Vías | es |
| dc.subject | Vías vehiculares | es |
| dc.subject | Infraestructura vial | es |
| dc.subject | pathways | en |
| dc.subject | vehicular roads | en |
| dc.subject | Road infrastructure | en |
| dc.title | Intercomunicación Vial del Tránsito Vehicular entre los Municipios de Villeta y Útica | es |
| dc.type | Trabajo de Grado | es |
| dc.publisher.program | Especialización en Gerencia de Proyectos | spa |
| dc.publisher.department | Facultad Ciencias Sociales y Empresariales. | spa |
| dc.creator.modality | Virtual | es |