Seccional Girardot Office 365 Egresados

Institutional Repository
Universidad Piloto de Colombia

    • Login
    JavaScript is disabled for your browser. Some features of this site may not work without it.
    View Item 
    •   Universidad Piloto de Colombia
    • Trabajos de grado - Posgrado
    • Facultad Ciencias Sociales y Empresariales
    • Especialización en Gerencia de Proyectos
    • View Item
    •   Universidad Piloto de Colombia
    • Trabajos de grado - Posgrado
    • Facultad Ciencias Sociales y Empresariales
    • Especialización en Gerencia de Proyectos
    • View Item

    Construcción de Ptard Nororiental de Montería

    Thumbnail
    View/Open
    Trabajo de Grado (8.031Mb)
    Anexo C Flujo de Caja (157.4Kb)
    Anexo H Cálculo de la Huella de Carbono (282.7Kb)
    Anexo I Matriz_p5 (473.0Kb)
    Anexo O Diagrama de Red (171.2Kb)
    Anexo W Registro de Riesgos (704.6Kb)
    Date
    2022
    Author
    Rojas Henao, Daniel Armando
    Vargas Suárez, Jahir
    Riaño Jiménez, Freddy Humberto
    QR Code
    xmlui.mirage2.itemSummaryView.ShareSection
    Exportar a Mendeley
    Metadata
    Show full item record
    Abstract
    El proyecto Construcción de una Planta de Tratamiento de Aguas Residuales Domésticas en la ciudad de Montería surge como una necesidad de mejoramiento de las condiciones ambientales de la comunidad del sector nororiental de la ciudad de Montería. El proyecto fue controlado con base en el cronograma y el presupuesto aprobado. Para su desarrollo se identificaron las especificaciones de referencia que definieron los parámetros técnicos de diseño los cuales se transformaron en planos de fabricación y especificaciones de equipos. Una vez se superó la fase de diseño conforme a los lineamientos de EDOSPINA SAS en lo relativo a la construcción de Plantas de Tratamiento de Aguas Residuales, se iniciaron las obras civiles con el acondicionamiento de terrenos y la construcción de cimientos estructurales, trazado de líneas de tuberías y se dio paso así a la construcción de tanques e infraestructura. Paralelamente se fueron construyendo las vías internas de la PTARD. Avanzadas las obras civiles se inicia la fase de acondicionamiento de equipos hidráulicos estáticos y rotativos, bombas, filtros, válvulas, controles entre otros, adaptados a infraestructura y a tubería. Acoplado todo el sistema se iniciaron pruebas hidráulicas para verificar el correcto flujo y el funcionamiento correcto de cada uno de los equipos, lo cual se hizo progresivamente y por etapas hasta lograr el ciclo hidráulico completo a través de la planta. Finalmente se realiza el proceso fisicoquímico del tratamiento de aguas verificando caudales, precipitación de lodos, comportamiento mecánico de equipos, implementación de análisis de laboratorio para control de la caracterización requerida. Durante este proceso se fue iniciando el proceso de capacitación del personal de operación para asegurar la competencia del equipo de trabajo una vez terminada la fase de puesta a punto de la PTARD. Estas fases se cumplieron satisfactoriamente y el resultado fue una Planta de Tratamiento de Aguas Residuales Domésticas con algunos aportes industriales funcionando a 525l/seg, cumpliendo con los requisitos de caracterización para vertimiento de aguas de la Corporación del Valle del Sinú y del San Jorge, mejoramiento de las condiciones ambientales en el sector con la eliminación de olores de las lagunas de oxidación existentes, recuperación de seguridad de la zona y mejoramiento del paisaje para la satisfacción de la comunidad y de las partes interesadas del proyecto.
     
    The project Construction of a Domestic Wastewater Treatment Plant in the city ​​of Montería emerges as a need to improve the environmental conditions of the community of the northeastern sector of the city of Montería. The project was controlled on the basis in the approved schedule and budget. For its development, the specifications were identified. of reference that defined the technical design parameters which became manufacturing drawings and equipment specifications. Once the design phase was passed according to to the guidelines of EDOSPINA SAS regarding the construction of Treatment Plants of Residual Waters, the civil works began with the preparation of land and the construction of structural foundations, layout of pipe lines and thus gave way to the construction of tanks and infrastructure. At the same time, internal roads were built of the PTARD. Once the civil works are advanced, the equipment conditioning phase begins static and rotary hydraulics, pumps, filters, valves, controls, among others, adapted to infrastructure and pipeline. Once the entire system was coupled, hydraulic tests were started to verify the correct flow and correct operation of each of the equipment, which was done progressively and in stages until the complete hydraulic cycle through the plant is achieved. Finally, the physicochemical process of water treatment is carried out, verifying flows, sludge precipitation, mechanical behavior of equipment, implementation of analysis of laboratory to control the required characterization. During this process, the training process for operating personnel to ensure the competence of the operating team work once the set-up phase of the PTARD has been completed. These phases were completed satisfactorily and the result was a Domestic Wastewater Treatment Plant with some industrial inputs operating at 525l/sec, meeting the requirements of characterization for discharge of water from the Sinú and San Jorge Valley Corporation, improvement of environmental conditions in the sector with the elimination of odors from the existing oxidation ponds, recovery of safety in the area and improvement of the landscape to the satisfaction of the community and project stakeholders.
     
    URI
    http://repository.unipiloto.edu.co/handle/20.500.12277/11977
    Collections
    • Especialización en Gerencia de Proyectos [1652]

    DSpace software copyright © 2002-2016  DuraSpace - Cristhian Rey
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2016  DuraSpace - Cristhian Rey
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    BIBLIOTECA UNIPILOTO
    Reglamento
    Reglamento
    Buzón de Sugerencias
    Buzón
    UBICACIÓN
    www.unipiloto.edu.co
    Universidad Piloto de Colombia
    Sede Bogotá
    Carrera 9 No. 45A - 44
    Para mayor información comuniquese al conmutador: (1) 332 29 00
    Línea gratuita nacional: 01 8000 110452
    PBX de Posgrados: 232 4122
    Universidad Piloto de Colombia
    Seccional Alto Magdalena - Girardot
    Carrera 19 No. 17 - 33
    Conmutador Girardot: (1) 836 0600
    Admisiones Girardot: 320 454 4348
    Universidad Piloto de Colombia
    Todos los derechos reservados © 2014
    • Inicio
    • Aspirantes
    • Estudiantes
    • Docentes
    • Egresados
    • Convocatorias
    • Valores de Matrícula 2018
    • Política de tratamiento de la información
    • Aviso de privacidad
    • Solicitudes