Show simple item record

dc.contributor.advisorFonseca Correa, Rafael Alberto
dc.contributor.authorQuintero Gonzalez, Solanlly Maryuri
dc.date.accessioned2022-07-15T12:45:17Z
dc.date.available2022-07-15T12:45:17Z
dc.date.issued2022-07-01
dc.identifier.urihttp://repository.unipiloto.edu.co/handle/20.500.12277/11821
dc.description.abstractLa presente tesis muestra la recolección y análisis de los documentos técnicos actualizados que ha realizado ACUALCOS desde el 2017 al 2020, con el propósito de verificar el cumplimiento de los requisitos legales que vigilan un adecuado uso de los vertimientos en base al Plan de Saneamiento de Manejo de Vertimientos (PSMV) aprobado por la CAR. Se desarrolla por capítulos utilizando información secundaria recopilada de un análisis detallado; (ubicación del área de intervención, problemas del suelo, antecedentes sociales y ambientales, diagnóstico del alcantarillado, sistema de tratamiento de aguas residuales, problemas urbanísticos, entre otros), dando una gran importancia a estas variables expuestas, ya que de ahí depende de que se pueda lograr la construcción de la PTAR. Se obtuvo como resultado un seguimiento detallado del PSMV, en donde se puede afirmar que cumple con los requisitos legales ante la entidad encargada. Además, de realizar un análisis propio de proyección poblacional, como de las muestras de los dos vertimientos y un seguimiento de la propuesta que se desea implementar para la construcción de la PTAR; arrojando valores ascendentes a los presentados por ACUALCOS que no son justificados al ser comparados, pero si aprobados por la entidad pertinente. Con todo esto se da origen a un documento académico que describe todo el proceso por el cual está empresa ha enfrentado para poder cumplir esta gran meta, que es la construcción de la PTAR para así solventar esta gran necesidad de 8.232 habitantes reportados en el PSMV, que son una parte de la ciudad de Bogotá y así reducir la contaminación que afecta todos los días nuestros ecosistemas y fuentes hídricas como lo es el río Bogotá.es
dc.description.abstractThis research shows the collection and analysis of the updated technical documents that ACUALCOS has carried out from 2017 to 2020, with the purpose of verifying compliance with the legal requirements that monitor an adequate use of discharges based on the Discharges Management Sanitation Plan (DMSP) approved by the CAR. It is developed by chapters using secondary information collected from a detailed analysis; (location of the intervention area, soil problems, social and environmental background, sewage diagnosis, wastewater treatment system, urban problems, among others), giving great importance to these exposed variables, since it depends on what the construction of the WWTP can be achieved. As a result, a detailed follow-up of the PSMV was obtained, where it can be affirmed that it complies with the legal requirements before the entity in charge. In addition, to carry out its own analysis of population projection, such as the samples of the two discharges and a follow-up of the proposal that it is desired to implement for the construction of the WWTP; throwing ascending values to those presented by ACUALCOS that are not justified when being compared but approved by the pertinent entity. With all this, an academic document is created that describes the entire process that this company has faced to meet this great goal, which is the construction of the WWTP in order to solve this great need of 8,232 inhabitants reported in the DMSP, that are a part of the city of Bogotá and thus reduce the pollution that affects our ecosystems and water sources every day, such as the Bogotá River.en
dc.rightsReconocimiento 2.5 Colombia*
dc.rights.urihttp://creativecommons.org/licenses/by/2.5/co/*
dc.subjectACUALCOSes
dc.subjectAgua residuales
dc.subjectAlcantarilladoes
dc.subjectPlanta de Tratamiento de Aguas Residuales (PTAR)es
dc.subjectRecurso hídricoes
dc.subjectImpacto ambientales
dc.subjectContaminación hídricaes
dc.subjectPlan de Saneamiento de Manejo de Vertimientos.es
dc.titleActualización de estudios para la implementación de la Planta de Tratamiento de Aguas Residuales para el barrio San Isidro I y II, San Luis y La Sureña. - Localidad Chapineroes
dc.typeTrabajo de Gradoes
dc.creator.modalityPresenciales


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Reconocimiento 2.5 Colombia
Except where otherwise noted, this item's license is described as Reconocimiento 2.5 Colombia