| dc.contributor.author | Arenas Elvira, Alejandra | |
| dc.contributor.author | Arango Cabezas, Andrés Felipe | |
| dc.contributor.author | Iriarte Suárez, Andrés Mauricio | |
| dc.contributor.author | Barreto Valderrama, Fernando | |
| dc.contributor.author | Cortés Martínez, Jhon Alejandro | |
| dc.contributor.author | Del campo García, José Fernando | |
| dc.date.accessioned | 2022-06-17T02:17:30Z | |
| dc.date.available | 2022-06-17T02:17:30Z | |
| dc.date.issued | 2022-06-11 | |
| dc.identifier.uri | http://repository.unipiloto.edu.co/handle/20.500.12277/11634 | |
| dc.description.abstract | En 2019, a raíz de la pandemia del COVID-19, la constructora Arango Arquitectos
Constructores S.A.S, tuvo inconvenientes al iniciar la construcción del proyecto Bentho,
generando sobrecostos administrativos y operativos, es así como surge la necesidad de
mejorar la productividad de futuros proyectos, reduciendo el tiempo de diseño y
mejorando la cuantificación de materiales. La metodología BIM como solución propuesta
ha permitido a la constructora generar nuevos procesos de diseño con alcances 3D y 5D,
reduciendo el tiempo de ejecución de los proyectos y aumentando sus márgenes de
ganancias, también incorporar recorridos virtuales en modelos 3D incrementando el
interés de los clientes, además de alienar sus objetivos con los lineamientos del sector
nacional en cuanto al uso de la metodología BIM. | es |
| dc.description.abstract | In 2019, as a result of the COVID-19 pandemic, the company Arango Arquitectos
Constructores S.A.S, had problems starting construction of Bentho project, increasing
administrative and operational costs, this is how the need to improve the productivity of
future projects appears, reducing design time and improving materials quantification. The
BIM methodology as a solution for that problem, has allowed to create new design
process with 3D and 5D scopes, reducing execution time of the projects and increasing
the company profits, also incorporating virtual tours in 3D models increasing the interest
of the clients, besides align its objectives according to the guidelines of construction in
Colombia for use of the BIM methodology. | en |
| dc.publisher | Universidad Piloto de Colombia | spa |
| dc.rights | Reconocimiento-CompartirIgual 2.5 Colombia | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-sa/2.5/co/ | * |
| dc.source | instname:Universidad Piloto de Colombia | spa |
| dc.source | reponame:Repositorio Institucional RE-pilo | spa |
| dc.subject | Metodología BIM | es |
| dc.subject | Alcance 3D | es |
| dc.subject | Alcance 5D | es |
| dc.subject | Mejora de procesos | es |
| dc.subject | Plan de Ejecución BIM | es |
| dc.subject | BIM methodology | en |
| dc.subject | 3D scope | en |
| dc.subject | 5D scope | en |
| dc.subject | Design Process Improvement | en |
| dc.subject | BIM Execution Plan | en |
| dc.title | Mejora del Proceso de Diseño (Metodología BIM) para la Constructora Arango Arquitectos Constructores S.A.S. | es |
| dc.type | Trabajo de Grado | es |
| dc.publisher.program | Especialización en Gerencia de Proyectos | spa |
| dc.publisher.department | Facultad Ciencias Sociales y Empresariales. | spa |
| dc.creator.modality | Virtual | es |