| dc.contributor.advisor | Velosa García, Marcela / Asesora | |
| dc.contributor.author | Hernández Quinchara, Diego Andrés | |
| dc.contributor.author | Solano Plazas, Karen Vanessa | |
| dc.date.accessioned | 2021-04-30T14:26:13Z | |
| dc.date.available | 2021-04-30T14:26:13Z | |
| dc.date.issued | 2021 | |
| dc.identifier.uri | http://repository.unipiloto.edu.co/handle/20.500.12277/10267 | |
| dc.description.abstract | El objetivo principal del Intercambio Vial Ayurá es permitir y mejorar la conectividad y movilidad vial entre los municipios de Medellín, Envigado e Itagüí; por consiguiente, su ubicación es transversal al Rio Medellín, permitirá la conexión de estos municipios de manera más efectiva y rápida, reduciendo los costos en tiempos de transporte, mejorando la productividad económica entre los municipios, facilitara la conectividad urbana para los usuarios del sector, mejorara las condiciones ambientales del sector y beneficiara socialmente a los habitantes del sector.
El proyecto está conformado por cinco (5) puentes vehiculares, los puentes 1 y 2 tienen sentido oriente-occidente con una longitud de 551 m y 542 m respectivamente, el puente 3 tiene sentido occidente-norte con una longitud de 212 m, el puente 4 tiene sentido oriente-norte con una longitud de 92 m, el puente 5 tiene sentido occidente-sur con una longitud de 70 m, la longitud de puentes vehiculares es de 1.467 m, los puentes vehiculares son unidireccionales de dos carriles. El puente 7 es en sentido oriente-occidente, conectando con la estación del METRO Ayurá con una longitud de 360 m la cual funciona como pasarela para la conectividad de los usuarios de ciclovía.
La infraestructura vial está conformada con un total de veinte (20) ejes de diseño vial que en conjunto tiene una longitud total acumulada de 6.740 metros; estos ejes viales diseñados permiten conectar y articular los cinco (5) puentes viales. Así mismo se requiere del traslado, relocalización y reposición de redes húmedas de acueducto, alcantarillado sanitario y alcantarillado pluvial, redes de gas de acuerdo con las especificaciones y normas establecidas por EPM, el traslado de las redes eléctricas asociadas y correspondientes al proyecto, incluye adecuaciones, variantes, relocalizaciones e implementaciones en los sistemas de redes de alta, media y baja tensión. | es |
| dc.description.abstract | The main objective of the Ayurá Road Exchange is to allow and improve road connectivity
and mobility between the municipalities of Medellín, Envigado and Itagüí; Consequently, its
location is transversal to the Medellín River, it will allow the connection of these municipalities
more effectively and quickly, reducing costs in transport times, improving economic productivity
between municipalities, facilitating urban connectivity for users of the sector, It will improve the
environmental conditions of the sector and socially benefit the inhabitants of the sector.
The project consists of five (5) vehicular bridges, bridges 1 and 2 have an east-west
direction with a length of 551 m and 542 m respectively, bridge 3 has a west-north direction with
a length of 212 m, bridge 4 It has an east-north direction with a length of 92 m, Bridge 5 has a
west-south direction with a length of 70 m, the length of vehicular bridges is 1,467 m, the vehicular
bridges are unidirectional with two lanes. Bridge 7 is in an east-west direction, connecting with the
METRO Ayurá station with a length of 360 m which functions as a gateway for the connectivity
of bicycle users.
The road infrastructure is made up of a total of twenty (20) road design axes that together
have a total cumulative length of 6.740 meters; These designed road axes allow the connection and
articulation of the five (5) road bridges. Likewise, the transfer, relocation and replacement of wet
aqueduct networks, sanitary sewers and storm sewers, gas networks in accordance with the
specifications and standards established by EPM, the transfer of the associated electrical networks
and corresponding to the project, includes adjustments, variants, relocations and implementations
in high, medium and low voltage network systems. | en |
| dc.publisher | Universidad Piloto de Colombia | spa |
| dc.rights | Reconocimiento-NoComercial-SinObraDerivada 2.5 Colombia | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/2.5/co/ | * |
| dc.source | instname:Universidad Piloto de Colombia | spa |
| dc.source | reponame:Repositorio Institucional RE-pilo | spa |
| dc.subject | Infraestructura vial | |
| dc.subject | Conectividad urbana | |
| dc.subject | Intercambiador vial | |
| dc.subject | Road infrastructure | en |
| dc.subject | Urban connectivity | en |
| dc.title | Construcción del intercambiador vial de la Ayurá en los municipios de Medellín, Envigado e Itagüí | es |
| dc.type | Trabajo de Grado | es |
| dc.creator.degree | Especialista en Gerencia de Proyectos | spa |
| dc.publisher.program | Especialización en Gerencia de Proyectos | spa |
| dc.publisher.department | Facultad Ciencias Sociales y Empresariales. | spa |
| dc.creator.modality | Virtual | es |